| Honeywell BX / BX2 - Installation, Adjustment & Set-point Calibration | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Release time:2026-11-24 13:40:51 | Views: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Honeywell MICRO SWITCH BX / BX2 are flameproof (Ex d) hazardous-area limit switches: the BX has an aluminum housing and the BX2 a 316L stainless steel housing, typically marked II 2 GD Ex db IIC T6 Gb / Ex tb IIIC T85 C Db. Installation, set-point adjustment and wiring must follow the official instructions: actuator head orientation, lever position, cam set point, terminal torque and flame paths are all specified. This article covers installation, adjustment and set-point calibration based on Honeywell official data sheets and installation instructions. I. Product Positioning
The data in this article was obtained via web search. Source: Honeywell official data sheet 002306 Issue 11, BX installation instructions 50083427, BX2 installation instructions 50047766; standards IEC 60079-0, IEC 60079-1, IEC 60079-31.
II. Pre-installation Check and Mechanical Mounting
The data in this article was obtained via web search. Source: Honeywell official BX2 installation instructions 50047766, Mounting / Actuator Head sections; BX installation instructions 50083427 for similar requirements; dimensions subject to the official drawings. III. Set-point and Actuator Head Adjustment
The key to set-point calibration is "position first, then lock the cam/lever": verify switch action at the actual fully open and fully closed valve positions, repeat fine adjustment if necessary; after adjustment, re-tighten all screws and restore sealing to prevent set-point drift from vibration. The data in this article was obtained via web search. Source: Honeywell official BX2 installation instructions 50047766, Adjusting Instructions and Reversing Direction of Actuation sections (Issue 11/16); tool set LSZ4005 listed in that instruction. IV. Wiring and Grounding Requirements
Never open a flameproof enclosure while energized; after maintenance restore cover threads, seals and locking clamp. After wiring, perform continuity/insulation and function tests to confirm NO/NC status matches the actual valve position. The data in this article was obtained via web search. Source: Honeywell official BX2 installation instructions 50047766, Wiring Instructions and Table 1 electrical ratings; BX installation instructions 50083427 for similar requirements; circuit diagram per nameplate. V. Ex Maintenance and Post-calibration Verification
After calibration, three verifications are recommended: switch action matches fully open/fully closed positions; terminal torque and cover sealing are restored; explosion-protection integrity (flame paths, plugs, entries, grounding) is intact. Area classification and medium properties must come from the project classification documents. The data in this article was obtained via web search. Source: Honeywell official BX2 installation instructions 50047766, Flame Path Measurements and warnings, BX installation instructions 50083427; installation and maintenance subject to the official manual. VI. Selection Guide and Common ModelsSelection guide: First determine the required EPL, gas group (IIA/IIB/IIC) and temperature class (T1-T6) from area classification and medium, then verify BX/BX2 Ex db IIC T6 Gb / Ex tb IIIC T85 C Db meets them. Then select housing by environment (BX aluminum / BX2 316L stainless steel), conduit entry by wiring (1/2", 3/4" NPT or 20 mm), and seal by temperature (fluorosilicone/fluorocarbon). Ex db is flameproof, NOT intrinsically safe Ex ia; if an intrinsically safe loop is required on site, verify whether a corresponding approval exists - if not found, state "unable to confirm, please verify with the manufacturer". Common models: BXA3K (BX aluminum side-rotary SPDT, 1/2" NPT), BXAC3K (fully fluorocarbon sealed); the BX2 series uses a 316L stainless steel housing with interfaces and approvals per the specific ordering code. LSZ4005 is the official adjustment tool set (includes a 9/64-inch hex key). Final markings and certificates follow the nameplate and original certificate documents. If you need to verify whether the mounting orientation, set point or wiring of a BX/BX2 unit suits your site requirements, please send us the nameplate data, valve travel and area classification. We can review the head orientation, cam setting and terminal torque item by item against the official installation instructions. Orders & InquiriesBaoman Industrial Technology (Chengdu) Co., LtdTel: +86 028-60220547 | Email: info@bit-cd.com Address: Room 1108, Building A, Tingbiao Central Plaza, No. 158 Erxianqiao East Road, Chenghua District, Chengdu, Sichuan Province, China The information above is not guaranteed to remain valid at all times. Subsequent changes will not be notified separately. Please confirm the latest information at the time of inquiry. |

简体中文
ENGLISH
